Civil/Government projects that have been completed.

Construction
Figure 1. Fleximat installed at the outfall of a drainage system for an erosion control project for the City of Southlake TX
Construction
Figure 2. Placing rocks in gabion baskets for erosion control, City of Southlake erosion control project.
Construction
Figure 3. Gabion baskets being installed at BB-Tributary for the City of Southlake erosion control project, Southlake TX
Construction
Figure 4. Installation of erosion control blank for the city of Southlake erosion control project.
Construction
Figure 5. Gabion basket being installed at Timmaron creek, city of Southlake TX
Construction
Figure 6. Excavation work being carried out for the city of Crowley TX drainage improvement project, Crowley TX
Construction
Figure 7. Inspection of excavation work being carried out.
Construction
Figure 8. Completion of the drainage project for the city of Crowley, Crowley TX
Construction
Figure 9. Grading and installation of RCPs, Crowley Quiet Zone project
Construction
Figure 10. Concrete work for median, Crowley Quiet Zone project
Construction
Figure 11. Placement of Asphalt on the roadway, Crowley Quiet Zone project
Construction
Figure 12. Demolition of existing roadway, city of Crowley Quiet Zone project.
Construction
Figure 13. Receiving safety brief from the safety inspector at railway crossing before inspection of demolition work, city of Crowley
Construction
Figure 14. Installation of formwork for roadway median and the installation of concrete panels for railway track, city of Crowley Quiet Zone project.

Residential Projects

Construction
Figure 15. Framing ongoing for a residential home
Construction
Figure 16. Completion of the framing for a new residential building
Construction
Figure 17. Completion of concrete foundation pad and rough plumbing work for a new home
Construction
Figure 18. Formwork for the foundation of a new residential building
Construction
Figure 19. Completion of framing for a new residential building
Construction
Figure 20. Completion of the installation of silt fence for a new residential development project
Construction
Figure 21. Installation of rebars for a new residential development pool.
Construction
Figure 22. Completion of a new residential building for a new development in Texas

Commercial Projects

Construction
Figure 23. Installation of metal joist for the Texas Department of Transportation district office renovation project, Corpus Christi Texas
Construction
Figure 24. Installation of duct bank, HVAC unit, and flooring for business in Texas

Commercial Projects Cont’d

Construction
Figure 25. Electrical Ductwork for the Texas Department of Transportation maintenance building, Lamarque Texas
Construction
Figure 26. Completion of the painting of interior walls for a commercial building in Texas

Heavy Construction

Construction
Figure 27. Drilling of foundation piers for the Texas Department of Transportation building in Lamarque Texas
Construction
Figure 28. Reinforcement of a foundation for an existing theatre building for the US Airforce, Wichita Falls Texas

Heavy Construction cont’d

Construction
Figure 29. Reclamation of an old mines for the Texas Department of Transportation, Somerset Texas
Construction
Figure 30. Information Coming Soon…
Construction
Figure 31. Installation of manhole junction box for a roadway project, Sheppard’s Airforce Base/Wichita Falls Texas
Construction
Figure 32. Placing of asphalt on base coarse for road reconstruction project, Sheppard AIr Force Base/ Wichita Falls Texas

Facility Management

Construction
Figure 33. Restroom rehabilitation project for the Federal Aviation Authority Air Route Traffic Control Center (ARTCC), Olathe Kansas
Construction
Figure 34. Inspection of HVAC unit for maintenance purposes for the FAA maintenance building, Olathe Kansas
Construction
Figure 35. Inspection of a building floor for resealing purposes, Wichita Falls Texas
Construction
Figure 36. Inspection of a building roof before renovation, Albuquerque New Mexico

Material Testing for Civil Projects

Construction
Figure 37. Core test being performed to check base coarse thickness, Wichita Falls Texas
Construction
Figure 38. Concrete slump testing being performed before the pouring of concrete for a roadway project, Sheppard Airforce Base/Wichita Falls Texas
Construction
Figure 39. Another base thickness sample being collected to validate base thickness through the core test, Wichita Falls Texas.
Profile 1. Project: Somerset Reclamation Project
  • Project Owner: Texas Railroad Commission
  • Description: Old Coal Mines reclamation
  • Scope: Heavy civil, earth moving, fill, compaction, grouting underground tunnel, grading, tree trimming, hydro-mulching
Project Cost: 3.5 Million 2. Granger Office Building Construction
  • Project Owner: Corps of Engineers
  • Project Description: Construction of office building ground up
  • Scope: Civil, Structural, electrical, Utility, HVAC, Thermal, landscape, communication, Opening and finishes.
Project Cost: 3.3 Million 3. Lake Granger Utility Improvement Project
  • Project Owner: Corps of Engineers
  • Project Description: Installing of 6-inch utility line
  • Scope: Removal and replacement of 6-inch water line 3600 LF, Installation of Force Main, trees cutting and trimming, select fill, and testing.
Project Cost: 1.6 Million 4. US Highway 97 & Textline Improvement (Rehabilitation and Overlay)
  • Project Owner: Texas Department of Transportation
  • Project Description: Highway Improvement (Rehab & Overlay) 21 Miles single lane
  • Scope: Milling, Overlay, tapping, stripping, installation of signs
Project Scope: 14.7 Million 5. Amarillo to Dumas Highway Improvement Project
  • Project Owner: Texas Department of Transportation
  • Project Description: Highway Improvement (rehab & Overlay)
  • Scope: Milling and overlay, cut and fill, Signpost and sign installation, Stripping and Painting
Project Cost: 9.7 Million 6. Overhaul Chillers (Dom A, D, &E Sheppard Airforce Base)
  • Project Owner: US Airforce (DOD)
  • Project Description: Overhaul Chiller System in (Dom A, D &E Sheppard Airforce Base)
  • Scope: Clean Chiller System, replacement pistons, and coolant fuel (Mechanical)
Project Cost: $500,000.00 7. Hurricane Improvement Project
  • Project Owner: City of Jasper, Texas
  • Project Description: Improving Creek Banks
  • Scope: grading, tree trimming, vapor retarder installation, riprap installation, grouting, asphalt repair, hydro-mulching
Project Cost: 1.3 Million 8. Saginaw Maintenance Office Renovation
  • Project Owner: Texas Department of Transportation
  • Project Description: General Renovation of Office Facility
  • Scope: Removal and replacement of flooring, Restroom remodeling, HVAC System removal and replacement, electrical improvement, removal and replacement of doors and windows, painting, removal and replacement of utilities
Project Scope: 750, 000.00 9. Lufkin HQ Drainage Improvement
  • Project Owner: Texas Department of Transportation
  • Project Description: Removal and replacement of storm sewer line
  • Scope: Demolishing of existing storm sewer line, excavation and placement of bedding material, installation of RCP & RCBs, JBs, construction of retaining wall, replacement of Chain-link fence, backfill, and seeding.
Project Cost: 5 million 10. La Marque Maintenance Department (TXDOT)
  • Project Owner: Texas Department of Transportation
  • Project Description: Construction of La Marque maintenance department facility
  • Scope: Civil, Structural, HVAC, Communication, Electrical, Thermal, Heavy Civil
Project Cost: 14.7 Million 11. Horse Creek Farm Drainage Improvement Project
  • Project Owner: City of Crowley, Texas
  • Project Description: Construction of Open-cast Storm Drainage
  • Scope: Erosion protection, Excavation, Installation of reinforcement, Concrete, Block sodding, flax mat
Project Cost: 1.1 Million 12. Quiet Zone Street Improvement (Mustang & Magnolia)
  • Project Owner: City of Crowley, Texas
  • Project Description: Creating a Railway Quiet Zone
  • Scope: Demolition and removal of existing roadway, demolition and removal of the existing base, proof roll sub-base, demolition and removal of driveway, demolition, and removal of existing CMP, Installation of RCP and driveway, installation of new roadway, installation of median, curb and gutter, stripping and painting, restoration
Project Cost: 1.5 Million [Learn About Our Company]